Projects

Object: the upper and lower platforms of the Sheskharis Transshipment Complex

Task: reconstruction, 1 stage

2014

Object: ОАО Nizhnekamskneftekhim

Task: selection and supply of a pumping unit for reconstruction of linear alfa-olefins production facility

2017

Object: Local heating station of a multidisciplinary healthcare clinic Avitsenna

Task: Comprehensive solution for the local heating station

2012

Object: Boiler house No. 1, Petropavlovsk-Kamchatsky

Task: assembly of utilities for a framed-type boiler house, Petropavlovsk-Kamchatsky

2014

Object: production plant of ОАО Lebedyanskiy

Task: equipping of two production shops and warehouse with an automated fire extinguishing system

2015

Object: automatic modular boiler room with capacity of 32 MW

Task: development and implementation of complex boiler room automation

2013

Object: the ground hall facility of Admiralteyskaya metro station

Task: automation of the cold supply and air conditioning systems

2014

Object: Shell lubricant plant

Task: supply of pipeline fittings and valves

2012

Object: Gremyachinskoye potassium ore field

Task: assembly of a sinking platform (lift) of a cage shaft

2012

Object: Astrakhan heat supply networks

Task: reconstruction and replacement of heat networks

2016

Object: 32 MW boiler house

Task: delivery of shut-off and control valves, filters and frequency converters

2014

Object: Sokol multi-functional centre

Task: supply of valves for a steam-turbine power unit

2008

Object: Boguchansk HPP

Task: pumping of liquids and immersed operation

2012

Object: sewage treatment plant

Task: effective wastewater mixing

2012

Object: ski resort

Task: artificial snowmaking

2013

Object: The sulphuric acid warehouse, Olimpiadinskiy Mining and Processing Plant

Task: supply of coated fittings

2016

Object: IHP of Akvamir Water Park

Task: complex delivery of equipment

2014

Object: Shishkin Les water intake station

Task: ensuring reliable operation of pumps at the water intake station

2011

Object: Mednogorsk Copper and Sulphur Plant

Task: modernization of existing processes

2016

Object: steam boiler room of Russkiy kolos, OJSC

Task: supply of control valves for technical upgrading of the steam boiler room