About us Projects Service Contacts
Разработка, производство и поставки оборудования для инженерных систем
ADL Development, production and supply of equipment for engineering systems
Moscow
Mon-Fri: 9:00 to 18:00
Sat-Sun: days off

Projects

2015 г.

Object: municipal water supply system

Task: reconstruction of water supply chambers

2012 г.

Object: Russian Scientific Surgery Centre n. a. Academician B. V. Petrovskiy

Task: supply of pipeline valves and fittings for reconstruction of utilities in building V and building D

2012 г.

Object: Titimukhta gold ore field developed by Olimpiadinskiy Mining and Processing Plant

Task: reconstruction of utilities and supply of shutoff valves for a gold-prospecting factory

2012 г.

Object: Maleyevka Art Centre

Task: reconstruction of building utilities, equipping of a new boiler house

2016 г.

Object: boiler house with power of 32.7 MW (28.1 GCal/h) with fume stacks and general utility networks

Task: modernization of Nytva heating system

2015 г.

Object: Skidel Sugar Factory, JSC

Task: supply of shutoff and control valves for plant modernization

2016 г.

Object: heat supply station of warehouse complex

Task: delivery of equipment

2015 г.

Object: The residential complex Atlantis 2 (residential house with integrated and attached premises for public purposes down Tigrovaya street)

Task: Supply of routine launching devices

2014 г.

Object: Polymer Pipe Plant

Task: supply of equipment for reliable operation of the shops heat supply system

2014 г.

Object: Kazan CHP-3, a branch of OAO TGC-16

Task: selection and supply of pipeline fittings and valves for heat supply system

2017 г.

Object: Heating networks in the Akademichesky residential district

Task: Ensuring trouble-free operation of trunk heat networks

2016 г.

Object: Steam boiler room of Ufa engine-building production association OJSC

Task: Selection and supply of equipment for steam boiler room with capacity of 24 tones/hour

2012 г.

Object: Edem residential complex

Task: construction of a heat supply unit

2012 г.

Object: Kuznetskaya CHP

Task: increasing the volume of water intake from the water intake station on the Tom River

2013 г.

Object: Federal State Unitary Enterprise on Manufacture of Bacterial and Viral Preparations of Chumakov Institute of Poliomyelitis & Viral Encephalitides at the Russian Academy of Medical Sciences, the Moscow region

Task: ensuring supply of process steam to the injection water storage and distribution system and removal of condensate produced

2013 г.

Object: Yekaterinburg Municipal Milk Factory No. 1

Task: supply of pipeline and control fittings and valves

2014 г.

Object: 3rd elevation pumping station, Minsk

Task: development of a unique pumping station of 8 pumps

2013 г.

Object: secondary general education school for 1,000 pupils

Task: construction of water supply and fire-extinguishing systems for the school building

2012 г.

Object: Bolshaya Koryazhma

Task: construction of a paper factory

2013 г.

Object: the solar modules production plant of OOO Khevel, Novocheboksarsk

Task: supply of valves and fittings for a cold supply plant system, cold and water supply pumping stations

Отправить запрос
Enter the e-mail address
Enter the phone
Enter a City
Protection against automatic messages
Сообщение об ошибке реквизитов
Прикрепить реквизиты
Наверх