About us Projects Service Contacts
Разработка, производство и поставки оборудования для инженерных систем
ADL Development, production and supply of equipment for engineering systems
Moscow
Mon-Fri: 9:00 to 18:00
Sat-Sun: days off

Projects

2012 г.

Object: Sibirskiy Stroitel Plant

Task: ensuring reliable operation of water supply and sewage systems

2014 г.

Object: manufacturing facility of Mareven Food Central

Task: supply of equipment for a new assembly line for production of snacks

2012 г.

Object: Territorial Generating Company No. 2 (TGC-2)

Task: piping of a wastewater neutralization unit of the chemical water treatment shop and supply of pipeline valves and fittings for the heat supply system

2013 г.

Object: manufacturing facility of ZAO Magna Automotive Rus

Task: selection and supply of diesel-driven and electrically driven pumps and pumping stations according to the FM Global standards

2015 г.

Object: A production plant manufacturing polymer films and polypropylene bags

Task: supply of equipment for the fire-extinguishing system

2013 г.

Object: shop for production of wet foods in the Kaluga region

Task: supply of fittings for an assembly line

2011 г.

Object: Belaya Ptitsa poultry slaughtering and processing plant

Task: ensuring effective operation of own boiler house and ventilation system

2012 г.

Object: ОАО Sady Pridonya Baby Food Plant

Task: assembly of a heat supply system

2011 г.

Object: Eastern Siberia — Pacific Ocean oil pipeline, oil pump station 34

Task: ensuring ESPO-2 pipeline and equipment protection from hydraulic impacts

2012 г.

Object: OAO Krastsvetmet

Task: monitoring and control of process medium in nitric acid pipelines

2012 г.

Object: Poliplast’s concrete plasticizers production shop

Task: replacement of coated and shutoff valves on process pipelines

2016 г.

Object: AminoSib wheat deep processing plant

Task: supply of shut-off and control valves for IHP of spirit workshop and IHP of feed-processing building

2013 г.

Object: Apollo Tyres plant, Durban

Task: precise steam pressure control

2015 г.

Object: Chelyabinsk GRES

Task: development of a pumping unit for pumping of process fluids and filling of de-icing system circuit

2013 г.

Object: ZAO Krasnoyarskiy Pig-Breeding Farm

Task: selection and supply of pumping equipment for fire-extinguishing and water supply systems

2011 г.

Object: the Arctic Ocean

Task: careful samples lifting from the ocean depth

2012 г.

Object: Tula Milk Factory

Task: reconstruction of a steam and condensate system

2016 г.

Object: boiler house with power of 32.7 MW (28.1 GCal/h) with fume stacks and general utility networks

Task: modernization of Nytva heating system

2015 г.

Object: Skidel Sugar Factory, JSC

Task: supply of shutoff and control valves for plant modernization

2014 г.

Object: Polymer Pipe Plant

Task: supply of equipment for reliable operation of the shops heat supply system

Отправить запрос
Enter the e-mail address
Enter the phone
Enter a City
Protection against automatic messages
Сообщение об ошибке реквизитов
Прикрепить реквизиты
Наверх