About us Projects Service Contacts
Разработка, производство и поставки оборудования для инженерных систем
ADL Development, production and supply of equipment for engineering systems
Moscow
Mon-Fri: 9:00 to 18:00
Sat-Sun: days off

Equipment for a heat supply unit of Mercury City tower building, Moscow

2012 г.

Object

Mercury City Tower, Moscow International Business Centre Moscow-City

Task

construction of a heat supply unit in a 70-storey building.

Solution

Mercury City Tower is a large scale complex of an impressive area of 158,258 m2 equipped with the most advanced utilities fully conforming to the class A requirements. The building has a modern 4-pipe conditioning system, central ventilation system, uninterrupted power supply system, back-up power source, and, most importantly considering the building size, the 1st category central heating system with two independent heat supply sources. For heating arrangement purposes, the site was split into 3 zones: — 5 storey; + 14 storey; + 41 storey.

ADL equipment was installed in all three zones. The project implementation took three years that is no wonder considering its enormous size and large supply volumes. In August 2012, the last portion of our equipment was shipped and now the Mercury is protected against even the most severe frost.

Отправить запрос
Enter the e-mail address
Enter the phone
Enter a City
Protection against automatic messages
Сообщение об ошибке реквизитов
Прикрепить реквизиты
Наверх