Large-size pipeline valves and fittings for use at a water intake station, Kaluga

2012 г.

Object

Kaluga Scientific and Production Electrometallurgical Plant

Task

supply of equipment for a pumping station at the water intake station located on the Protva River for the needs of Kaluga Scientific and Production Electrometallurgical Plant

Solution

The project for construction of the electrometallurgical plant is included in the list of top-priority investment projects under the strategy of development of metallurgical industry in Russia by 2020. The project investment volume is more than 37 billion roubles. The steel production facility with annual capacity of up to 1.55 million tons of steel per year is to be commissioned in 2013.

As part of construction of Kaluga Scientific and Production Electrometallurgical Plant, a water duct from the Protva River was installed at which a pumping station for the closed water supply system is being constructed. ADL supplied own-produced Granval DN 500 butterfly valves for use at the water intake station.

Each ADL valve is produced under the control of personnel that has passed a practical training at a production plant in Spain and is subject to the two-stage testing and marking with the number of the worker in charge of assembly, so the personal responsibility for the quality of manufactured products is ensured.